dcondo hype rangsit

Expected completion Date : September 2024
  • The environmental impact assessment has been approved.
  • A construction permit has already been issued.
  • Structural Work
    Pile-driving work is 100% Structual work is completed on floor 7 for Tower A.
    Structual work is completed on floor 5 for Tower B
  • Systems installation
    Installation of pumbling systems underway is 100% on Floor 3 for Tower A.
    Installation of pumbling systems underway is 100% on Floor 1 for Tower b.
  • Architectural Work
    Tower A: Wall construction is completed on Floor 3.
    Tower B: Wall construction is completed on Floor 1.